Latchways® Vertical System - How to Install to an Aluminium Ladder

Course Aim

This module is for persons who are required to carry out installations, inspections and using Latchways vertical systems on the following structures:

  • Wind turbines fitted with aluminium ladders
  • Aluminium access ladders

msa latchways

Latchways® Vertical System - How to Install to an Aluminium Ladder

Course Content

  • Install a Latchways vertical system to an aluminium ladder.
  • Install a temporary rope system to an aluminium ladder.
  • Install a permanent vertical system to an aluminium ladder using a 7 or 10 rung extension post (ground installation method).
  • Install a permanent vertical system to an aluminium ladder using a 7 or 10 rung extension post (retro fit).
  • Uninstall a temporary rope system post permanent system installation.
  • Install a vertical system to an aluminium ladder using a 3 rung top anchor and strengthening kit (ground installation method).
  • Install a vertical system to an aluminium ladder using a 3 rung top anchor and strengthening kit (retro fit).

Learning Outcomes

To install a Latchways vertical system to an aluminium ladder.

Download course content
  • Half a Day
  • Min 3 Max 6 people
  • Training Academy or on-site
  • MSA Latchways Certificate
  • Valid for 3 years
ENQUIRE ABOUT THIS COURSE » Book online or check availability »

Or call our booking team on 0114 250 7411

For more information please contact us...